Sunday, February 21, 2010

kitchen appliances and more color...
















the appliances are in and the floor in the kitchen and upstairs bathroom (both tile) are completed as of today. the bead board is up in the bathroom (upstairs). i am including pictures of the appliances, bathroom, and kids bedrooms. josie's is a mint green. gavin's room is gray (go bucks!). annabelle's room is a very pale purple. thanks for stopping by!





amber and joe





Friday, February 5, 2010

We have color...and a kitchen floor











update time! joe finished the kitchen floor today (18 X 18 tiles...BIG job). the upstairs bathroom tile floor is 3/4 complete. the appliances are being delivered tomorrow (as long as the weather permits). we still have all the hardwood floors to finish (i say "we" very loosely...HA). the upstairs bathroom is a bright periwinkle color(there will be bead board around the bottom half of the room). the dining room and entry way are a deep goldish-brown. the kitchen is "creamy dill". i only know how to include 5 photos at a time, so i will have a post with the kids bedrooms, our bedroom, and the utility room in the next few days. thanks for checking in on us.
amber