update time! joe finished the kitchen floor today (18 X 18 tiles...BIG job). the upstairs bathroom tile floor is 3/4 complete. the appliances are being delivered tomorrow (as long as the weather permits). we still have all the hardwood floors to finish (i say "we" very loosely...HA). the upstairs bathroom is a bright periwinkle color(there will be bead board around the bottom half of the room). the dining room and entry way are a deep goldish-brown. the kitchen is "creamy dill". i only know how to include 5 photos at a time, so i will have a post with the kids bedrooms, our bedroom, and the utility room in the next few days. thanks for checking in on us.
amber
No comments:
Post a Comment